Iasi
Major project in Valea Lupului Commune: construction of a Green School for sustainable development and modern education
Valea Lupului Commune has announced a major project with an estimated budget of 40.7 million RON for the construction of a green school featuring 19 classrooms. This new educational facility aims to address the increasing school-age population and enhance educational infrastructure, positively impacting economic development and environmental protection
In an interview with the economic publication Moldova Invest, Valea Lupului’s Mayor Liviu Dulgheru provided details about this crucial project for the local community: the construction of a green school. This initiative marks a significant step in the sustainable development of the commune, addressing growing demographic needs and contributing to the well-being of its residents.
The Mayor explained that the need for this project arose due to a substantial increase in the young population of Valea Lupului. “We have observed a 13 percent increase in the number of students in the community,” the mayor emphasized, referring to the demographic expansion among children.
Regarding the project’s impact on the commune’s economic development, Mayor Liviu Dulgheru stated: “This project will have a significant impact, both in the medium and long term. Currently, we have only one school with 15 classrooms, but we aim to provide much more.”
The new school, which will be built to the most modern energy efficiency standards, will offer numerous benefits to the community. The mayor compared this investment to “a breath of fresh air” for Valea Lupului, highlighting the importance of expanding educational infrastructure in parallel with demographic growth.
Another key aspect discussed in the interview was the goals and benefits of constructing a green school. The mayor emphasized: “We are obliged to invest in education. By doing so, the benefits come naturally. People settle in the commune, contributing to the local budget and community development. There are also environmental and health benefits since children will no longer need to commute to the city, thus reducing traffic and pollution.”
The green school project in Valea Lupului demonstrates the local administration’s commitment to investing in education and supporting the sustainable development of the community. The mayor concluded the interview with a message of confidence in the commune’s future, expressing hope that this investment will significantly improve the quality of life for the residents of Valea Lupului.
Valea Lupului Commune Announces Major Tender for the Construction of a New Green School. Valea Lupului Commune, located in Iași County, has announced the launch of a highly significant tender for the construction of a new green school. The project aims to create a modern and ecological educational institution designed to meet the educational needs of the local community and contribute to the region’s sustainable development.
Project Details
The green school project in Valea Lupului includes the development of a facility with 19 classrooms, which will be divided between middle school and high school. The primary goal of this project is to improve educational conditions and accessibility for all students in the area, particularly for vulnerable groups.
Technical characteristics of the project are as follows:
- Land Area: 6,640 sqm
- Building Height: Basement + Ground Floor + First Floor + Partial Floor
- Ground Built Area: 1,795.30 sqm
- Total Built Area: 5,382.60 sqm
- Usable Area: 4,116.10 sqm
- Number of Parking Spaces: 15
- Green Space Area: 2,429.30 sqm
- POT (Land Occupation Ratio): 27%
- CUT (Land Use Coefficient): 0.81
For the realization of the project, Valea Lupului Commune is seeking bids for the following services:
- Design Services: Development of architectural and technical plans in compliance with current regulations and ensuring an ecological educational environment.
- Technical Assistance from the Designer: Oversight of construction work and ongoing technical consultancy throughout the construction process.
- Construction Works: Actual construction, including all necessary building and installation work for the optimal functioning of the school.
Financial Aspects
The estimated value of the project is 40,730,000 RON (excluding VAT), structured into various expenditure categories as follows:
- Site Preparation: 30,000 RON
- Environmental Protection and Land Restoration: 200,000 RON
- Utilities (electricity, water, sewage): 200,000 RON
- Design and Technical Assistance: 1,650,000 RON
- Construction and Installations: 34,900,000 RON
- Technological and Functional Equipment: 3,700,000 RON
- Site Organization: 50,000 RON